Spirit River Gas Plant Project

In May, 2014 ENTREC had been awarded the transportation of various pieces of equipment as well as their on-site installation.

Double-Bunk Load

In August, 2014 ENTREC successfully transported a very large “flash stripper” vessel from Edmonton, Alberta to the Fort McKay, Alberta.

Transformer Re-Locates

Re-location of a series of large transporters from several sites in southern Alberta to their final destinations near Brooks and Langdon, Alberta area.

Vessel Tandem Lift and Transport

Two ENTREC AT cranes lifted a large vessel in-tandem from a railcar located in Dickinson, North Dakota, and onto an awaiting dual-lane trailer.

On-site Dredge Move

transporting a fully assembled 36” dredge from one location to another on a large industrial site in the Ft. McMurray area.

Cryogenic Vessel Lift

The vessel was fabricated in Texas, and transported the Dawson Creek, British Columbia area.

 
 