Featured Project

Spirit River Gas Plant Project
Load:

Numerous

ENTREC Equipment:
  • Various hydraulic platform trailers – ranging from 8-lines to 18-lines for larger pieces; for smaller elements all manner of conventional trailers from high-boy trailers to 9-axles trailers to 40 wheelers.
  • 120T all-terrain crane
  • 225T all-terrain crane
  • Numerous prime movers
  • Various picker trucks
Description:

ENTREC received confirmation in May, 2014 that we had been awarded the transportation of various pieces of equipment as well as their on-site installation; work began the following month. The project was strictly “greenfield” in nature – resulting in significant staging and logistic consideration, including temporary storage to accomplish orderly delivery. The total project consisted of approximately 130 loads - with over ¾ of the loads originating in Calgary, with the rest coming from vendors around the Province (including Forestburg, Red Deer, Stettler, Nisku, Leduc, Edmonton, Lloydminister and Hythe), and all were bound for a site just outside of Spirit River, Alberta. The project wrapped up in early September, 2014.

ENTREC Branches:
  • Calgary, Alberta
  • Acheson, Alberta
  • Leduc, Alberta
  • Whitecourt, Alberta
  • Fort McMurray, Alberta
  • Bonnyville, Alberta
  • Grande Prairie, Alberta
  • Dawson Creek, British Columbia
ENTREC Team
Operations Terry Ford, Cordell Krysta, Kevin O’Donnell
Operations Manager John Young
Project Manager Jason Beutler
Dispatch Jackie Martin
Crane Supervisor Jordin Beck
Jack & Slide Crew Daniel McMaster, Gordan McGonigal, Ty Burke, Billy Bolen
Numerous shop staff and crew!  
 
 